Project Description

The Wijngracht Theatre in Kerkrade dates back to about 1978 and has been adapted a number of times over the years to meet changing usage requirements. After the various adjustments to the theatre, the municipality decided to renovate the building to bring it back up to current requirements. This resulted in renovation of theatre Kerkrade into a multifunctional accommodation (theatre hall, multipurpose hall, library), maintaining only the shell of the building.

For this we provided the complete consultancy for the theatrical fly system, sound system, PoR, design, tendering, execution supervision, delivery and aftercare. We also advised on the room acoustics.

 

Our advice regarding renovation

  • Preparation of theatrical Technical Program of Requirements.
  • Consulting stage mechanical installations
  • Consulting theatre lighting
  • Consulting theatre sound systems
  • Consulting electrical installations
  • Zero measurement theater installations


Our sound system advice

  • P.A. system,
  • Digital Mixer and infra.
  • Multi cable system, digital and renovation of existing analog infrastructure
  • Intercom for the dressingrooms and backstage areas
  • Hearing assistance installation
  • Theatre intercom, both wired and wireless
  • Microphone sets including accessories and storage facilities
  • Mobile sound sets, consisting of speakers and a mixer.


Our advice on lifting installation

In the procurement phase:

  • Drafting of the Descriptions of Work.
  • Drafting Procurement Guidelines
  • Drafting General Terms and Conditions
  • Supervising site visit and Note of Information
  • Reviewing tenders

 

In the implementation phase:

  • Kick-off meeting and project plan review
  • Construction supervision
  • Contruction completion