The theatrical fly system no longer complied with the applicable regulations and functionalities, in addition, the maximum service life had been well past its limit in parts, which meant that operational reliability could no longer be guaranteed.
Our consulting Complete consulting on the theatrical fly system, feasibility study, PoR, design, tendering, execution supervision, delivery and aftercare.