Theater de Bussel – Oosterhout
Redevelopment Santrijn area, renovation Theater de Bussel
Client
Municipality of Oosterhout
Hall
Large hall, small hall, library
Architect
DP6 Architectuurstudio
Floor Area
approx. 7,600 m2 GFA
Project Description
Theater de Bussel reopened in 2015 after a major renovation. Together with the library ‘Theek5’ and the tourist office, they are situated in a beautiful modern building.
Our advice
Theatre construction in general
- Functional advice regarding seating plan and sightlines plan of the halls, ambience image, room layout, etc.
- Spatial and functional incorporation of engineering facilities.
- Functionality advice on the layout as a cultural venue.
- Functionality advice on the shipping area and logistical routes with respect to the “front of house” (Front of House) and the “back of house” (Backstage) and the library.
- Advising on health and safety measures for theatre technicians
Theatre technology installations
- Stage mechanical systems: theatrical fly system, other lifting devices, bridges, moveable floor(s)
- Theatre lighting system: connections, dimmers, cabling, filters, control desk
- Theatre sound system: auditorium amplification, call system dressing rooms and foyer, theatre intercom system
- Theatre curtains and fabrics: dance vinyl, curtian plan, projection screens
- Theatre video viewing system
- Electrical theatre installations of the theatrical components in mentioned items
Halls
Large hall, theatre hall 492 seats
Small hall, multipurpose 210 seats